UK/England/Herefordshire/River Teme in Ludlow

Water classified as poor in 2025. Bathing is not advised. Check the signs on site.

River Teme in Ludlow, Richard's Castle

No votes yet

River Teme in Ludlow is a river bathing spot near Richard's Castle in Herefordshire, England. The water is classified as poor (2025). During the 2026 bathing season, 1 pollution incident was reported here.

The River Teme flows south through Ludlow towards its confluence with the River Severn. The bathing river area stretches from the Linney boating pontoon just over 200m downstream to the Ludlow Mill beach, just upstream of Dinham bridge. This stretch of river crosses the Ludford Mill Wier. Access to the swimming area is via the Ludlow Mill beach.

Weather today and the next days

Forecast: MET Norway.

Directions · 52.36643, -2.72537

Water qualityPoor Classification 2025
Last sample22 September 2026 low
Bathing season 202615 May – 30 September
Pollution incidents, season 20261
Nearest townRichard's Castle
Bathing water profileenvironment.data.gov.uk

Measured the water?

Water quality

Samples 2026

DateE. coliEnterococci
22 September16045low
17 September280120low
8 September11045low
3 September23082low
27 August1,1002,200above limit
23 August3636low
19 August28064low
11 August14010low
5 August13027low
31 July12027low
22 July12027low
12 July14027low
7 July8210low
1 July3610low
25 June12027low
19 June25073low
10 June220110low
5 June28073low
26 May30010low
20 May170100low

Bacteria per 100 ml. The limit used here for a single sample is 1,000 E. coli or 400 enterococci; low is half of that or less. Source: Environment Agency.

Classification

SeasonClass
2025Poor
2024Poor

Samples by year

YearSamplesAbove limit
2026201
2025202
2024205

Pollution incidents

  • 4 August 2026 – 1 September 2026: sewage
  • 1 October 2024 – 8 October 2024: agricultural waste

There is a large catchment area above the River Teme at Ludlow, which includes rivers and streams that will receive runoff from both urban and rural areas. The impact of these is currently unknown, and further investigations will be required. The Environment Agency works to improve water quality in rivers and reduce potential sources of pollution. Diffuse runoff from agriculture and settlements upstream of the bathing water will also affect the bacteriological quality of the River Teme. Freshwater ecological and physio-chemical monitoring has been completed in this river since 1985 and shows a long-term trend of improving river quality. Estimations of time of travel of the river are around 8.5 hours from Leintwardine to Ludlow which is around 14 miles and demonstrates the connectivity of the bathing water with the upstream catchment. This travel time is estimated using average flows (Q51) but at low flows (<20 m3/s), the travel time is increased to 14.8 hours.

Photos

Got a photo?

By uploading you confirm that the photo is yours and may be published here.

Reviews

What is the beach like?

No reviews yet.

Beaches in Herefordshire · Beaches in England